T R A C K       P A P E R
ISSN:2394-3661 | Crossref DOI | SJIF: 5.138 | PIF: 3.854

International Journal of Engineering and Applied Sciences

(An ISO 9001:2008 Certified Online and Print Journal)

Research on Control and Management of Cruise Ships Construction Schedule Plan

( Volume 6 Issue 8,August 2019 ) OPEN ACCESS
Author(s):

Yi YU, Jiawei CHEN, Zhengshan SHENG

Abstract:

Progress control management plays a very important role in the process of cruise ships construction. How to improve the construction plan management level of domestic cruises ships has become an issue concerned by the industry. By analyzing the status of cruise ships construction plan management at home and abroad, this paper draw up the construction schedule plan suitable for domestic cruise ships, and study the possible deviation in the cruise ships construction schedule. By using the method of network plan graph, the causes of deviation were analyzed and solutions were proposed, so as to ensure the construction schedule of cruise ships.

DOI DOI :

https://dx.doi.org/10.31873/IJEAS.6.8.2019.13

Paper Statistics:

Total View : 1245 | Downloads : 1236 | Page No: 51-54 |

Cite this Article:
Click here to get all Styles of Citation using DOI of the article.