T R A C K       P A P E R
ISSN:2394-3661 | Crossref DOI | SJIF: 5.138 | PIF: 3.854

International Journal of Engineering and Applied Sciences

(An ISO 9001:2008 Certified Online and Print Journal)

Throughput and Delay Analysis in a Real Time Network

( Volume 2 Issue 12,December 2015 ) OPEN ACCESS
Author(s):

Umeh O. A., Akpado K.A., Okechukwu G. N., Ejiofor H. C.

Abstract:

The aim of this paper is to evaluate the throughput and delay performance of IEEE802.11 WLANs using different network performance monitoring tools. It also shows detailed procedure on how to use these network monitoring tools (NetStress, Wireshark and Jperf) to monitor a real time network.  The study was carried out to establish the effects of varying the number of work stations against the network performance in a real WLAN environment.  The result shows that maximum throughput and minimum delay can only be achieved in the non saturated case, that is, it is dependent on the number of active nodes.

Paper Statistics:

Total View : 1293 | Downloads : 1284 | Page No: 27-34 |

Cite this Article:
Click here to get all Styles of Citation using DOI of the article.